SECTION B: PRO-T(M), PRO-TB(M) Relay logic controls with Interface Module
(UL325 2010 compliant)
Operator electrical connections and start-up instructions
Important: Follow these steps carefully and in the order shown
1) Connect Power supply:
Single phase: Connect single phase power supply to terminals L/L1 and N/L2 on the 3-pole power terminals strip.
3-phase: Connect 3-phase power supply to terminals L1, L2 and L3 on the 3-pole power terminal strip.
2) Connect Push-button station for installation purposes (single phase or 3-phase):
Connect open/close/stop push button station to terminals T2 (stop), T3 (common), T4 (open) and T6 (temporary CP on
close).
NOTE: THIS OPERATOR COMES WITH AN INTERFACE MODULE INTEGRATED INTO THE CONTROL CIRCUIT.
THE PURPOSE OF THE INTERFACE MODULE IS TO ALLOW FOR FAILSAFE MONITORING OF A MICANAN
COMPATIBLE SAFETY DEVICE AS PER UL 325 (2010) REQUIREMENTS.
Commentaires sur ces manuels